Custom Manufacturing
Engineered-to-Print Brass & Metal Components
From your CAD file or sample part, we engineer, tool, validate, and manufacture precision brass and metal components under our ISO 9001:2015 and IATF 16949:2016 quality systems.
- Submit Your RFQInclude your 2D drawing, 3D STEP/IGES file, or physical sample. Specify alloy, tolerances, finish, and standards compliance required.
- Engineering Review (3u20135 days)Our engineers review for manufacturability, recommend alloy and process, and identify any DFM improvements.
- QuotationYou receive EXW Jamnagar pricing, tooling cost (amortized option available), lead time, and PPAP scope (if automotive).
- Tooling & Samples (4u201310 weeks)Tooling fabricated in-house. First article samples produced and dimensional report provided for your approval.
- PPAP & Production (if automotive)Full PPAP documentation package submitted for your approval before serial production.
- Serial ProductionProduction under SPC monitoring, with COC and MTR documentation on every lot.
Capabilities
| Alloys | C36000 free-machining u00b7 C37700 forging u00b7 C27450 lead-free NSF 61 u00b7 C26000 u00b7 C83600 bronze u00b7 C65500 silicon bronze u00b7 DZR CW602N |
| Processes | CNC turning u00b7 CNC milling u00b7 Multi-spindle turning u00b7 Hot forging u00b7 Cold forging u00b7 Extrusion u00b7 Electroplating |
| Tolerances | Standard u00b10.05mm u00b7 Precision u00b10.02mm u00b7 Thread 6H/6g gauge verified 100% |
| Part Size | OD: 3mm u2013 150mm u00b7 Length: up to 300mm u00b7 Hex: up to 100mm AF |
| Finish | Natural brass u00b7 Chrome u00b7 Nickel u00b7 Tin u00b7 Zinc u00b7 Shot blast u00b7 Polish u00b7 Laser marking |
| Documentation | ISO 9001 COC u00b7 PPAP Level 1u20135 u00b7 FMEA u00b7 Control Plan u00b7 MSA u00b7 SPC u00b7 MTR u00b7 RoHS |
| MOQ | 250u20131,000 pcs depending on complexity |
| Lead Time | New tooling + PPAP: 10u201316 weeks u00b7 Existing tooling: 4u20138 weeks |
Submit your RFQ and our US-based B2B sales team will respond with technical data sheets and EXW pricing within 1-2 business days.
